S-Plan · 9 parts · 29 wires

S-Plan with a digital room stat wiring diagram

In short

An S-Plan is a fully pumped heating system with two 2-port motorised zone valves, one for central heating and one for hot water, driven by a programmer, a room thermostat and a cylinder thermostat. Each valve’s end switch feeds the boiler’s switched live, so the boiler fires only while a valve is open: the boiler interlock.

S-Plan with a digital room stat fully wired in the DrawWarm simulator

A working S-Plan with a digital room stat in the simulator. Wire colours follow BS 7671; every terminal is live, neutral, earth or dead, and the meter reads what the circuit is doing.

Wiring centre numbering

The numbering is a convention so that the next engineer can read your work. A block carries whatever you land on it; the test harness proves the same system wired on scrambled blocks.

BlockCarries
1Permanent live from the fused spur (brown)
2Neutral (blue)
3Earth (green/yellow)
4CH ON from the programmer, out to the room thermostat L
5Room thermostat call, out to the heating valve brown
6HW ON from the programmer, out to the cylinder thermostat C
7Spare on an S-Plan
8Cylinder thermostat call, out to the hot water valve brown
9Spare
10Both valve oranges in, boiler switched live out
11Spare
12Spare

Every wire, terminal by terminal (29)

#FromTerminalToTerminalColour
1Heat-Only BoilerPLCirculation PumpLGrey
2Heat-Only BoilerEWiring Centre3Green/yellow (earth)
32-Port Valve (heating)EWiring Centre3Green/yellow (earth)
42-Port Valve (hot water)EWiring Centre3Green/yellow (earth)
5Dual Channel ProgrammerEWiring Centre3Green/yellow (earth)
6Fused SpurEWiring Centre3Green/yellow (earth)
7Fused SpurNWiring Centre2Blue (neutral)
8Circulation PumpNWiring Centre2Blue (neutral)
92-Port Valve (heating)NWiring Centre2Blue (neutral)
10Heat-Only BoilerNWiring Centre2Blue (neutral)
112-Port Valve (hot water)NWiring Centre2Blue (neutral)
12Dual Channel ProgrammerNWiring Centre2Blue (neutral)
13Fused SpurLWiring Centre1Brown (live)
14Heat-Only BoilerLWiring Centre1Brown (live)
152-Port Valve (heating)OWiring Centre10Orange
162-Port Valve (hot water)OWiring Centre10Orange
17Wiring Centre4Dual Channel Programmer4Grey
18Cylinder ThermostatCWiring Centre6Brown (live)
19Wiring Centre6Dual Channel Programmer3Grey
202-Port Valve (hot water)BWiring Centre8Brown (live)
212-Port Valve (heating)BWiring Centre5Brown (live)
222-Port Valve (heating)GWiring Centre1Grey
232-Port Valve (hot water)GWiring Centre1Grey
24Circulation PumpEWiring Centre3Green/yellow (earth)
25Heat-Only BoilerSLWiring Centre10Orange
26Dual Channel ProgrammerLWiring Centre1Brown (live)
27Wiring Centre8Cylinder Thermostat1Grey
28Wiring Centre4Digital Room Stat1Brown (live)
29Digital Room Stat2Wiring Centre5Grey

The truth table it must pass

Commissioning is four demand states and four results. The test harness runs this table against the circuit before every release.

DemandResult
No demand: programmer HW off and CH off (room stat calling, cylinder cold)Both valves stay closed; boiler off
CH only: programmer CH on (room stat calling, cylinder cold)Heating valve opens, hot water valve stays closed; boiler fires and the pump runs
HW only: programmer HW on (room stat calling, cylinder cold)Hot water valve opens, heating valve stays closed; boiler fires and the pump runs
CH + HW: programmer HW on and CH on (room stat calling, cylinder cold)Both valves open; boiler fires and the pump runs
Programmer HW on and CH on, both stats satisfiedBoth valves closed; boiler off

Related

If this is your home: this page is written for heating engineers. Mains wiring and gas appliances are not DIY jobs; call a Gas Safe registered engineer. If you smell gas, leave the building and call the National Gas Emergency Service on 0800 111 999.

Your first fault is waiting.

The demo opens with the launch: leave your email and the link lands in your inbox that day.

Get the demo link